| Projects Completed in 2014 |
| Kandilli Thermal Power Plant |
Hema Elektrik Üretim A.Ş. (Hattat Holding) |
Project Cancelled (2014) |
| Kireçlik Thermal Power Plant |
Batı Karadeniz Elektrik Üretim A.Ş. (Hattat Holding) |
Project Cancelled (2014) |
| Conducting Ground Surveys for the Excavation Soil, Construction and Demolition Waste Storage Area Implementation Project |
Karadeniz Ereğli Belediyesi |
EIA Not Required Decision (10.03.2014) |
| Edirne İpsala Korucuköy Dam, Irrigation and Material Quarries Project EIA Report Preparation |
Dsi 11. Bölge Müdürlüğü Edirne |
EIA Positive Decision (06.05.2014) |
| Gümüşhane Province, Torul District, Atalar Village Flood Protection Project |
Dsi 22. Bölge Trabzon |
EIA Not Required Decision (20.01.2014) |
| Gümüşhane Province, Central District, Akocak Village Flood Protection Project |
Dsi 22. Bölge Trabzon |
EIA Not Required Decision (20.01.2014) |
| Ceyhan Biomass Power Plant |
Ekton Enerji Elektrik Üretim Ve Tic. A.Ş. |
EIA Positive Decision (12.12.2014) |
| Korucuköy Irrigation Dam, Irrigation Canals, Material Quarries, Crushing-Screening Plant and Concrete Plant |
Dsi 11. Bölge Müdürlüğü Edirne |
EIA Positive Decision (05.02.2014) |
| Komet Integrated Natural Gas Combined Cycle Power Plant and Natural Gas Pipeline (107 km Planned to Pass Through Konya and Karaman Provinces) |
Komet Enerji San. Ve Tic. A.Ş. |
EIA Positive Decision (26.03.2014) |
| Akkuyu Nuclear Power Plant |
Akkuyu Ngs Elektrik Üretim A.Ş. |
EIA Positive Decision (01.12.2014) |
| Fatsa Hydroelectric Power Plant [56,79 MWm/55,10 MWe] ({Tanyeri Dam and Kavşak Hydroelectric Power Plant [46,7 MWe], Bolaman Dam and Hydroelectric Power Plant [8,4 MWe]}), Material Quarries and Crushing-Screening Plant Project |
Turkuaz Elektrik Üretim A.Ş. (Borusan Enbw) |
EIA Positive Decision (14.02.2014) |
| Caustic Soda Production Unit Project |
Riotur Madencilik A.Ş. (Ciner Grup) |
EIA Positive Decision (24.01.2014) |
| Sedef Energy Plant (600 MWe-615 MWm-1385 MWt) Coal Storage and Ash Disposal Areas Project |
İpekyolu Enerji Üretim Sanayi Ve Ticaret A.Ş. |
EIA Positive Decision (13.08.2014) |
| Projects Completed in 2013 |
| Stream Rehabilitation and Flood Prevention Project between Lake Uluabat and the Marmara Sea |
T.C. Bursa Büyükşehir Belediye Başkanlığı Buski Genel Müdürlüğü |
EIA Not Required Decision (28.01.2013) |
| Didim Akbük Water Supply Project Beşparmak Dam and Material Areas EIA Report Preparation |
Aydın Dsi 21. Bölge Müd. |
EIA Positive Decision (05.04.2013) |
| Salt Production (Extraction) 201101074 |
Lozan Yapı Elek. Mad. Nak. San. Ve Tic. A.Ş. |
EIA Positive Decision (10.09.2013) |
| Boreas I Enez WPP Capacity Increase (20 MW-8 Turbines) |
Boreas Elektrik Üretim Sistemleri San. Ve Tic. A.Ş. |
EIA Not Required Decision (27.12.2013) |
| Protection of Harmanözü Village Settlements in Bayburt Province from Kale and Yayla Stream Floods |
Dsi 22. Bölge Trabzon |
EIA Not Required Decision (17.12.2013) |
| Protection of Aydıntepe Settlements in Bayburt Province from Kozlak (Gavnez) Stream Floods |
Dsi 22. Bölge Trabzon |
EIA Not Required Decision (17.12.2013) |
| Protection of Yukarıkırzı Village Settlements in Aydıntepe District, Bayburt Province from Kavaklı Stream Floods |
Dsi 22. Bölge Trabzon |
EIA Not Required Decision (17.12.2013) |
| Karadona Stream Valley Rehabilitation Project |
Dsi 22. Bölge Trabzon |
EIA Not Required Decision (27.12.2013) |
| Flood Protection Project on Kesiş, Saydere, Soldere, Asarkaya, Yoliçi Streams and Tributaries in Keşap District PTD |
Dsi 22. Bölge Trabzon |
EIA Not Required Decision (27.12.2013) |
| Flood Protection Project on Abdal, Çayırağzı and Karanlık Streams in Piraziz District PTD |
Dsi 22. Bölge Trabzon |
EIA Not Required Decision (27.12.2013) |
| Flood Protection Project for Özlü Village Settlements and Agricultural Lands from Özlü Stream in Tirebolu District |
Dsi 22. Bölge Trabzon |
EIA Not Required Decision (27.12.2013) |
| Flood Protection Project on Gemitaş, Kabadere, Okluobuz, Stadyum, Kavlakoğlu and Yanderesi Çambaşı Streams in Görele District PTD |
Dsi 22. Bölge Trabzon |
EIA Not Required Decision (27.12.2013) |
| Trabzon Province, Akçaabat District, Şinik Town Derindere Stream Flood Protection Project |
Dsi 22. Bölge Trabzon |
EIA Not Required Decision (16.12.2013) |
| Trabzon Province, Çarşıbaşı Kaleköyü, Kale Stream Flood Protection Project |
Dsi 22. Bölge Trabzon |
EIA Not Required Decision (16.12.2013) |
| Rize Province, Central District, Yenikasar Village Settlements Korgun Stream Flood Protection Project |
Dsi 22. Bölge Trabzon |
EIA Not Required Decision (16.12.2013) |
| Ardeşen Kahveciler, Cami, Kuzey and Baş Neighbourhoods Dolana Stream Flood Protection Project |
Dsi 22. Bölge Trabzon |
EIA Not Required Decision (16.12.2013) |
| Çayeli District, Liman Köy Neighbourhood Hamuda Stream Flood Protection Project |
Dsi 22. Bölge Trabzon |
EIA Not Required Decision (16.12.2013) |
| Iron Mine Quarry, Crushing-Screening and Beneficiation Plant Project (Kütahya Province, Simav District) |
Demir Export A. Ş. |
EIA Not Required Decision (15.05.2013) |
| Günhan Wool Washing and Wastewater Treatment Plant Project |
Günhan Grup Hayvancılık Nak. San. Ve Tic. Ltd. Şti. |
EIA Positive Decision (30.09.2013) |
| Hocaköy Dam and Material Quarries Project |
T.C. İnegöl Belediye Başkanlığı Su İşleri Müdürlüğü |
EIA Positive Decision (09.09.2013) |
| Kırıkkale Cogeneration Plant Project (242 MWe-249,3 MWm-460,2 MWt) |
Seymenoba Elektrik Üretimi A.Ş. (Aesentek) |
EIA Positive Decision (20.05.2013) |
| Mersin Natural Gas Combined Cycle Power Plant Capacity Increase Project (1148,4 MWe-1160 MWm-1916,5 MWt) |
Akfen Enerji Üretim Ve Ticaret A.Ş. |
EIA Positive Decision (10.12.2013) |
| Enka Gebze Machinery Organized Industrial Zone Natural Gas Combined Cycle Power Plant |
Enka Elektrik Üretim A.Ş. |
Project Cancelled (2013) |
| Esco Natural Gas Combined Cycle Power Plant Project (423 MWe - 430 MWm - 753 MWt) |
Esco Enerji Sistemleri Elektrik Üretim Sanayi Ve Ticaret A.Ş. (Era Grup) |
EIA Positive Decision (14 February 2013) |
| Hema Port (Fill Area and Quay) Project |
Hattat Enerji Ve Maden Ticaret A.Ş. |
EIA Positive Decision (22.11.2013) |
| Iran-Turkey-Europe Natural Gas Pipeline Project, Turkey Section (Ağrı-Edirne) |
Sebat Proje Mühendislik Müşavirlik Tic. Ltd.Şti-Turang Transit Taşımacılık A.Ş. |
EIA Positive Decision (26 February 2013) |
| Kemah Dam and Hydroelectric Power Plant (Hydroelectric Power Plant I and Hydroelectric Power Plant II) (197,9 MWe-202,15 MWm) Concrete Plant, Crushing-Screening Plant and Material Quarries Project |
Ak-El Kemah Elektrik Üretim A.Ş. |
EIA Positive Decision (27.01.2013) |
| Mut WPP (50 MW) Project |
Güney Rüzgarı Elektrik Üretim Ve Ticaret A.Ş. (Borusan Enbw) |
EIA Not Required Decision (5 February 2013) |
| Ceyhan Natural Gas Combined Cycle Power Plant 2x(570 MWe-586 MWm-965 MWt) Project |
Park Elektrik Üretim Madencilik Sanayi Ve Ticaret A.Ş.(Ciner Grup) |
EIA Positive Decision (2013) |
| Ege Electricity Aliağa Natural Gas Combined Cycle Power Plant Capacity Increase (600 MWe Second Unit Addition) Project |
Ege Elektrik Üretim A.Ş. (Çolakoğlu Grup) |
EIA Positive Decision (06.06.2013) |
| Projects Completed in 2012 |
| Gerze Energy Plant (1.200 MWe-1.214 MWm-2.696 MWt) (Thermal Power Plant, Ash Disposal and Jetty) Project |
Anadolu Termik Santralleri Elektrik Üretim A.Ş. |
Project Cancelled (2012) |
| Aksu (Yankol) Regulator and Hydroelectric Power Plant Capacity Increase Project |
Yedigöl Hidroelektrik Üretim Ve Ticaret A.Ş. (Borusan Enbw) |
EIA Not Required Decision (28 June 2012) |
| Aliağa Natural Gas Combined Cycle Power Plant Project (470 MWe) |
Ege Elektrik Üretim A.Ş. (Çolakoğlu Grup) |
EIA Positive Decision (27 July 2012) |
| Brewery Capacity Increase Project (from 2.700.000 Hl/Year to 3.150.000 Hl/Year) |
Anadolu Efes Biracılık Ve Malt Sanayi A.Ş. |
EIA Not Required Decision (19 July 2012) |
| Ore Crushing-Screening Plant Capacity Increase and Ore Crushing-Screening-Beneficiation Plant (Sivas Province, Kangal District, Pınargözü Village) |
Demir Export A. Ş. |
EIA Not Required Decision (23 November 2012) |
| Didim-Akbük Water Supply Project |
Devlet Su İşleri Genel Müdürlüğü 21. Bölge Müdürlüğü |
EIA Positive Decision (14 December 2012) |
| Istanbul Metropolitan Municipality (İBB) Waste Incineration and Energy Generation Facility |
İstanbul Büyükşehir Belediye Başkanığı |
EIA Positive Decision (04 July 2012) |
| Kızkayası Dam, Hydroelectric Power Plant (115,26 MWe/115,51 MWm) and Material Quarries Project |
Çalık Enerji Elektrik Üretim Ve Madencilik A.Ş. |
EIA Positive Decision (21.09.2012) |
| Mersin Natural Gas Combined Cycle Power Plant Capacity Increase Project (575,70 MWe-575,76 MWm-1041 MWt) |
Akfen Enerji Üretim Ve Ticaret A.Ş. |
EIA Not Required Decision (21 September 2012) |
| Nabucco Natural Gas Pipeline Turkey Section (Ankara-Kırklareli) Project |
Su-Yapı Mühendislik Müşavirlik A.Ş. |
EIA Positive Decision (12 November 2012) |
| Lake Tuz Underground Natural Gas Storage Facility |
Atlas Petrol Gaz İthalat İhracat Pazarlama Ticaret A.Ş. |
EIA Positive Decision (11.04.2014) |
| Yalnızardıç Dam and Berat Hydroelectric Power Plant Project |
Albe Elektrik Elektronik Danışmanlık Müşavirlik San. Ve Tic. A.Ş. (Kolin) |
EIA Not Required Decision (12 December 2012) |
| Projects Completed in 2011 |
| Aksu Dam, Hydroelectric Power Plant (147,5 MWe) and Material Quarries |
Çalık Enerji Elektrik Üretim Ve Madencilik A.Ş. |
EIA Positive Decision (27 December 2011) |
| Kemalpaşa WPP |
RENOVA (STEAG) |
PTD process completed. |
| Güney-I WPP |
SANKO |
PTD process completed. |
| Lalahan Wastewater Treatment Plant |
ASKİ (ÜÇER) |
PTD process completed. |
| Temelli Wastewater Treatment Plant |
ASKİ (ÜÇER) |
EIA process completed. |
| Tepekışla Hydroelectric Power Plant |
SANKO |
EIA Positive Decision (08.06.2011) |
| Berat Concrete Plant |
KOLİN |
EIA Not Required Decision (16.05.2011) |
| Yalnızardıç Hydroelectric Power Plant |
KOLİN |
EIA Positive Decision (16.05.2011) |
| Vita Park Golf and Tourism Complex |
VİTA PARK |
EIA Positive Decision (29.04.2011) |
| Bandırma-II Natural Gas Combined Cycle Power Plant |
ENERJİSA |
EIA Positive Decision (06.04.2011) |
| Mersin Natural Gas Combined Cycle Power Plant |
AKFEN |
EIA Positive Decision (12.01.2010) |
| Kavşak Bendi Hydroelectric Power Plant Capacity Increase |
ENERJİSA |
EIA Positive Decision (23.02.2010) |
| Aliağa Energy Plant |
ENKA |
EIA Positive Decision (05.05.2010) |
| Balır Hydroelectric Power Plant |
KOLİN |
EIA Not Required Decision (12.12.2010) |
| Kırıkkale Natural Gas Combined Cycle Power Plant |
ÇALIK |
EIA Positive Decision (09.11.2010) |
| Düzhanlar Regulator and Hydroelectric Power Plant |
ÇALIK |
EIA Not Required Decision (17.06.2010) |
| Yeşilovacık WPP |
RENOVA (STEAG) |
EIA Not Required Decision (21.10.2010) |
| 2011 Universiade Winter Games |
GSGM (YÜKSEL PROJE) |
EIA Positive Decision (15.01.2009) |
| Kalecik Wastewater Treatment Plant |
ASKİ (ÜÇER) |
EIA Not Required Decision (03.01.2009) |
| Yamanlı-II Hydroelectric Power Plant and Material Quarries |
ENERJİSA |
EIA Positive Decision (13.02.2009) |
| Köprü Dam, Hydroelectric Power Plant and Material Quarries |
ENERJİSA |
EIA Positive Decision (18.02.2009) |
| Menge Dam, Hydroelectric Power Plant and Material Quarries |
ENERJİSA |
EIA Positive Decision (18.02.2009) |
| Cevizlik Regulator and Hydroelectric Power Plant |
SANKO |
EIA Positive Decision (20.02.2009) |
| Tufanbeyli İR 71332 Limestone Site |
ENERJİSA |
EIA Not Required Decision (09.03.2009) |
| Tufanbeyli İR 71464 Limestone Site |
ENERJİSA |
EIA Not Required Decision (09.11.2009) |
| Elmadağ Wastewater Treatment Plant |
ASKİ (ÜÇER) |
EIA Not Required Decision (31.03.2009) |
| Boreas-III WPP |
BOREAS |
EIA Not Required Decision (22.04.2009) |
| Çatalca WPP Capacity Increase |
SANKO |
EIA Not Required Decision (24.04.2009) |
| Egemen Hydroelectric Power Plant |
ZAFER |
EIA Not Required Decision (30.04.2009) |
| Taşlıktepe WPP |
AKFEN |
EIA Required Decision (21.05.2009) |
| Gürsan Limestone Quarry and Crushing-Screening Plant |
GÜRSAN |
EIA Positive Decision (30.09.2009) |
| Airres-III WPP |
SANKO |
EIA Required Decision (27.04.2009) |
| Balabanlı WPP |
BP |
EIA Positive Decision (02.09.2009) |
| Mozaik WPP |
AKFEN |
EIA Not Required Decision (15.05.2009) |
| Meryem WPP |
TÜRKERLER |
EIA Not Required Decision (19.06.2009) |
| Gölmarmara WPP |
TÜRKERLER |
EIA Not Required Decision (09.09.2009) |
| Bozüyük WPP |
TÜRKERLER |
EIA Not Required Decision (19.06.2009) |
| Yakapınar WPP |
TÜRKERLER |
EIA Required Decision (14.05.2009) |
| Afyon-II WPP |
TÜRKERLER |
EIA Not Required Decision (30.10.2009) |
| İncesu WPP |
TÜRKERLER |
EIA Not Required Decision (20.10.2009) |
| Sandıklı WPP |
TÜRKERLER |
EIA Not Required Decision (20.10.2009) |
| Dinar WPP |
TÜRKERLER |
EIA Not Required Decision (20.10.2009) |
| Kalkandere Hydroelectric Power Plant Capacity Increase |
SANKO |
EIA Positive Decision (06.11.2009) |
| Karagedik Wastewater Treatment Plant |
ASKİ |
EIA Not Required Decision (09.11.2009) |
| Çatalkaya Regulator, Hydroelectric Power Plant and Material Quarries |
SANKO |
EIA Not Required Decision (15.01.2008) |
| Kozbükü Regulator Hydroelectric Power Plant and Koçlu Regulator Hydroelectric Power Plant |
SANKO |
EIA Not Required Decision (21.01.2008) |
| Muğla Wastewater Treatment Plant |
MUĞLA Beld. (TEMELSU) |
EIA Not Required Decision (28.01.2008) |
| Pirahmet Regulator, Hydroelectric Power Plant and Material Quarries |
SANKO |
EIA Not Required Decision (10.01.2008) |
| Tufanbeyli Thermal Power Plant Capacity Increase |
ENERJİSA |
EIA Not Required Decision (25.01.2008) |
| Bandırma-I Natural Gas Combined Cycle Power Plant |
ENERJİSA |
EIA Positive Decision (27.03.2008)* |
| Bala-Karali-Bezirhane Wastewater Treatment Plant |
ASKİ (ÜÇER) |
EIA Not Required Decision (23.06.2008) |
| Kesikköprü Wastewater Treatment Plant |
ASKİ (ÜÇER) |
EIA Not Required Decision (23.06.2008) |
| Rolling Mill Facility |
KOCAER |
EIA Positive Decision (28.08.2008) |
| AYAS Energy Plant |
AYAS ENERJİ (İSKEN) |
EIA Positive Decision (17.12.2008) |
| Kars Livestock and Fattening Organized Industrial Zone |
KARS BELEDİYESİ |
EIA Positive Decision (29.03.2007) |
| Ceyhan Refinery and Petrochemical Complex |
ÇALIK |
EIA Positive Decision (16.11.2007) |
| Marmaris Port Ferry Pier Extension |
MARMARİS Lim. İşlt. A.Ş. |
EIA Positive Decision (13.12.2007) |
| Kavşak Bendi Dam, Hydroelectric Power Plant and Material Quarries |
ENERJİSA |
EIA Positive Decision (05.10.2007) |
| Yedigöze Sanibey Dam, Hydroelectric Power Plant and Material Quarries |
SANKO |
EIA Positive Decision (06.06.2007) |
| Buzlupınar Regulator and Kayalar Hydroelectric Power Plant |
SANKO |
EIA Not Required Decision (26.11.2007) |
| Kalkandere Regulator and Yokuşlu Hydroelectric Power Plant |
SANKO |
EIA Not Required Decision (23.11.2007) |
| Boreas-I Enez WPP |
BOREAS |
EIA Not Required Decision (23.07.2007) |
| Çambaşı Regulator and Hydroelectric Power Plant |
ENERJİSA |
EIA Not Required Decision (24.07.2007) |
| Limestone Quarry and Crushing-Screening Plant Capacity Increase |
SİSTEM |
EIA Not Required Decision (13.04.2007) |
| Yumrutepe Regulator and Hydroelectric Power Plant |
İÇTAŞ |
EIA Not Required Decision (21.11.2007) |
| Sugözü Energy Plant Marine Vessel Shelter |
İSKEN |
EIA Not Required Decision (27.01.2006) |
| Ankara Cyberpark R&D Technology Facilities |
BİLKENT ÜNİVERSİTESİ |
EIA Not Required Decision (10.02.2006) |
| Tufanbeyli Thermal Power Plant |
CİNER |
EIA Positive Decision (15.02.2006) |
| Ankara-Konya High-Speed Train |
TCDD (YÜKSEL PROJE) |
EIA Positive Decision (31.03.2006) |
| Kayseri Nickel and Chromium Mine Quarry |
SANKO |
EIA Not Required Decision (24.05.2006) |
| Kayseri Parteks Paper Production Facility |
PARTEKS |
EIA Positive Decision (02.06.2006) |
| Iğdır Solid Waste Sanitary Landfill Facility |
IĞDIR BELEDİYESİ |
EIA Positive Decision (14.06.2006) |
| Aydınlı Asphalt Production Capacity Increase |
İSFALT |
EIA Not Required Decision (18.12.2006) |
| Habibler Asphalt Production Facility |
İSFALT |
EIA Not Required Decision (13.11.2006) |
| Mahmutbey Asphalt Production Facility |
İSFALT |
EIA Not Required Decision (17.12.2006) |
| Kayseri Solid Waste Sanitary Landfill Facility |
KAYSERİ BŞ. BELEDİYESİ |
EIA Positive Decision (29.11.2006) |
| Ankara-Istanbul High-Speed Train |
YÜKSEL |
Exempt from EIA because it is a project that started before 1993. The report was prepared for the EIB. (2006) |
| Kars Solid Waste Sanitary Landfill Facility |
KARS BELEDİYESİ |
EIA Positive Decision (20.10.2005) |
| Bursa Light Rail System Phase II |
BURSA BŞ. BELEDİYESİ |
EIA Not Required Decision (22.12.2005) |
| Tokat Reşadiye Geothermal Heating System |
REŞADİYE BELEDİYESİ |
EIA Not Required Decision (29.07.2005) |
| Kadıköy-Kartal Rail Public Transport System |
İETT |
EIA Not Required Decision (22.07.2005) |